|
Twitter
|
Facebook
|
Google+
|
VKontakte
|
LinkedIn
|
Viadeo
|
English
|
Français
|
Español
|
العربية
|
 
International Journal of Innovation and Applied Studies
ISSN: 2028-9324     CODEN: IJIABO     OCLC Number: 828807274     ZDB-ID: 2703985-7
 
 
Tuesday 16 April 2024

About IJIAS

News

Submission

Downloads

Archives

Custom Search

Contact

  • Contact us
  • Newsletter:

Connect with IJIAS

  Now IJIAS is indexed in EBSCO, ResearchGate, ProQuest, Chemical Abstracts Service, Index Copernicus, IET Inspec Direct, Ulrichs Web, Google Scholar, CAS Abstracts, J-Gate, UDL Library, CiteSeerX, WorldCat, Scirus, Research Bible and getCited, etc.  
 
 
 

Study of the economic viability of the investment project for the 400 kV Inga-Moanda-Cabinda-Pointe-Noire power line


[ Etude de la viabilité économique du projet d’investissement de la ligne électrique 400 kV Inga-Moanda-Cabinda-Pointe-Noire ]

Volume 36, Issue 1, April 2022, Pages 222–225

 Study of the economic viability of the investment project for the 400 kV Inga-Moanda-Cabinda-Pointe-Noire power line

Yaba Moke Ngeme Liévin1

1 Institut Supérieur de Techniques Appliquées de Kinshasa, RD Congo

Original language: French

Copyright © 2022 ISSR Journals. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Abstract


The electrification project is mainly linked to the financial results, rather than to its technical aspect. As part of our research subjed, we considered the subscribed power, the annual energy requested, the annual revenue after 15 years, the cost of the loan, the repayment period of 15 years, the annual interest rate at 10 %, the kWh price of 0.01 USD and operating load in 15 years. Our study produced the results giving the elements of analysis of the economic viability of an electrification project, which is a major contribution in the field of the electric network.

Author Keywords: Viability, economical, project, investment, Inga-Moanda-Cabinda-Pointe-Noire power line.


Abstract: (french)


Le projet d’électrification est principalement lié aux résultats financiers, plus tôt qu’à son aspect technique. Dans le cadre de notre sujet de recherche, nous avons considéré la puissance souscrite, l’énergie annuelle demandée, la recette annuelle après 15 ans, le coût du prêt, la durée de remboursement de 15 ans, le taux d’intérêt annuel à 10 %, le prix kWh de 0,01 USD et la charge d’exploitation en 15 ans. Notre étude a produit les résultats donnant les éléments d’analyse de la viabilité économique d’un projet d’électrification, ce qui est une contribution d’une envergure capitale dans le domaine du réseau électrique.

Author Keywords: Viabilité, économique, projet, investissement, ligne électrique Inga-Moanda-Cabinda-Pointe-Noire.


How to Cite this Article


Yaba Moke Ngeme Liévin, “Study of the economic viability of the investment project for the 400 kV Inga-Moanda-Cabinda-Pointe-Noire power line,” International Journal of Innovation and Applied Studies, vol. 36, no. 1, pp. 222–225, April 2022.