Laboratoire Kaba de Recherche en Chimie et Applications, Université Nationale des Sciences, Technologies, Ingénierie et Mathématiques, B.P. 2282 Goho, Abomey, Benin
Pineapple waste at Promo Fruits Benin is bulky and difficult to manage. In addition, the company is dependent on electrical and thermal energy. With the aim of reducing waste and the energy bill, a technical-economic and environmental study was carried out. The methodology used is based on the analysis of energy needs, the study of recovery processes, economic and environmental analysis. The results showed that the company's annual energy consumption in electricity and diesel is 600 MWh and 307,695 liters respectively. The annual waste potential available is 11,607 T while that necessary to meet the company's energy needs is 14,904 T. The study of the choice of process retained biomethanation. The Functional Specifications of the reactor allowing said recovery has been defined and the digester has been sized. The economic study for a period of 25 years revealed that the investment cost is 2,101,196,208 FCFA and that the operating cost is 19,385,128 FCFA per year. In addition, the study made it possible to reduce from 96,434,691.12 FCFA to 0 FCFA the annual bill for electrical energy and from 123,078,750 FCFA to 71,898,186 FCFA for thermal energy of the company. From an environmental point of view, a reduction of 472.76 tonnes CO_2/year is obtained from emissions produced by non-recovered waste.