|
Twitter
|
Facebook
|
Google+
|
VKontakte
|
LinkedIn
|
Viadeo
|
English
|
Français
|
Español
|
العربية
|
 
International Journal of Innovation and Applied Studies
ISSN: 2028-9324     CODEN: IJIABO     OCLC Number: 828807274     ZDB-ID: 2703985-7
 
 
Saturday 23 November 2024

About IJIAS

News

Submission

Downloads

Archives

Custom Search

Contact

  • Contact us
  • Newsletter:

Connect with IJIAS

  Now IJIAS is indexed in EBSCO, ResearchGate, ProQuest, Chemical Abstracts Service, Index Copernicus, IET Inspec Direct, Ulrichs Web, Google Scholar, CAS Abstracts, J-Gate, UDL Library, CiteSeerX, WorldCat, Scirus, Research Bible and getCited, etc.  
 
 
 

Operate an open pit over and through the voids of an old underground mining: Case of Tazalaght copper Ore open pit mine


[ Exploitation d'une mine à ciel ouvert au-dessus et à travers les vides d'une ancienne exploitation souterraine : Cas de la mine à ciel ouvert de cuivre de TAZALAGHT ]

Volume 14, Issue 1, January 2016, Pages 37–45

 Operate an open pit over and through the voids of an old underground mining: Case of Tazalaght copper Ore open pit mine

Younès TAHIR1, Said Rziki2, Tarik Soror3, Mohammed Sellami4, and Mohammed Karim Benhachemi5

1 Département de Génie des Procédés et Environnement, Equipe Eau, Sol et Environnement, Université Hassan II de Mohammedia, FSTM Faculté des Sciences et Techniques de Mohammedia, BP 146 Mohammedia 20650, Morocco
2 Reminex Mines et carrières, BP 469, Marrakech, Morocco
3 Reminex Mines et carrières, BP 469, Marrakech, Morocco
4 Reminex Mines et carrières, BP 469, Marrakech, Morocco
5 Département de Génie des Procédés et Environnement, Equipe Eau, Sol et Environnement, Université Hassan II de Mohammedia, FSTM Faculté des Sciences et Techniques de Mohammedia, BP 146 Mohammedia 20650, Morocco

Original language: French

Copyright © 2016 ISSR Journals. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Abstract


The ore mining Tazalaght open pit is risky because of the presence of empty old underground rooms used by the method of long holes without filling and shrinkage stoping.
To minimize the risk a multidisciplinary approach has been implemented by the engineering REMINEX Mines and Quarries team and the technical team.
The approach began with the compilation and modeling of ancient mining operations followed by a survey by CMS accessible voids followed by a geotechnical study of the deposit which was used to model the zones of influence of voids and dimensioning crown pillars and abutments respect to operate safely.
Several cored geotechnical surveys were conducted to explore the empty and unstable areas. Before starting the operation execution plans were developed followed by a detailed study of blasting patterns and monitoring vibration measurements.
This work aims to present the different approaches used for the safe operation of the deposit for Tazalaght.
These approaches could be of great help to the mining development in Morocco by the re- use of old mines that pose the same risk as the deposit Tassrirt.


Author Keywords: Empty rooms, subsidence, geotechnical, geophysical, firing pattern, vibration.


Abstract: (french)


L'exploitation du gisement de Tazalaght à ciel ouvert est risquée à cause de la présence des vides des anciennes chambres exploitées en souterrain par la méthode des longs trous sans remblayage et la méthode des chambres magasins.
Afin de minimiser le risque, une approche pluridisciplinaire a été mise en œuvre par l'équipe d'ingénierie de REMINEX Mines et Carrières et la direction technique.
L'approche a commencé par la compilation et la modélisation des anciens travaux d'exploitation suivie d'un levé par CMS des vides accessibles puis par une étude géotechnique du gisement qui a permis de modéliser les zones d'influence des vides et de dimensionner les stots et les piliers à respecter pour exploiter en toute sécurité.
Plusieurs sondages carottés géotechniques ont été réalisés pour l'exploration des vides et des zones instables. Avant le démarrage de l'exploitation les plans d'exécution ont été élaborés suivi par une étude détaillée des schémas de tir et d'un suivi des mesures de vibrations.
Le présent travail a pour but de présenter les différentes approches utilisées pour l'exploitation en sécurité du gisement de Tazalaght.
Ces approches pourraient être d'un grand secours au développement minier du Maroc par la ré-exploitation des anciennes mines qui présentent le même risque comme le gisement de Tassrirt.


Author Keywords: Chambres vides, affaissement, géotechnique, géophysique, vibration.


How to Cite this Article


Younès TAHIR, Said Rziki, Tarik Soror, Mohammed Sellami, and Mohammed Karim Benhachemi, “Operate an open pit over and through the voids of an old underground mining: Case of Tazalaght copper Ore open pit mine,” International Journal of Innovation and Applied Studies, vol. 14, no. 1, pp. 37–45, January 2016.