|
Twitter
|
Facebook
|
Google+
|
VKontakte
|
LinkedIn
|
Viadeo
|
English
|
Français
|
Español
|
العربية
|
 
International Journal of Innovation and Applied Studies
ISSN: 2028-9324     CODEN: IJIABO     OCLC Number: 828807274     ZDB-ID: 2703985-7
 
 
Thursday 21 November 2024

About IJIAS

News

Submission

Downloads

Archives

Custom Search

Contact

  • Contact us
  • Newsletter:

Connect with IJIAS

  Now IJIAS is indexed in EBSCO, ResearchGate, ProQuest, Chemical Abstracts Service, Index Copernicus, IET Inspec Direct, Ulrichs Web, Google Scholar, CAS Abstracts, J-Gate, UDL Library, CiteSeerX, WorldCat, Scirus, Research Bible and getCited, etc.  
 
 
 

Study of the financial viability of the project to deploy the Medium Voltage/Low Voltage electrical distribution network in the MPASA 1 district, Nsele commune, city-province of Kinshasa in DR Congo


[ Etude de la viabilité financière du projet de déploiement du réseau électrique de distribution Moyenne Tension/Basse Tension dans le quartier MPASA 1, commune de la Nsele, ville province de Kinshasa en RD Congo ]

Volume 36, Issue 1, April 2022, Pages 231–234

 Study of the financial viability of the project to deploy the Medium Voltage/Low Voltage electrical distribution network in the MPASA 1 district, Nsele commune, city-province of Kinshasa in DR Congo

Yaba Moke Ngeme Liévin1

1 Institut Supérieur de Techniques Appliquées de Kinshasa, RD Congo

Original language: French

Copyright © 2022 ISSR Journals. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Abstract


The plan to deploy a distribution network is mainly linked to financial results, rather than to its technical aspect. As part of our research subject, we condidered the installed power, the annual energy requested, the annual revenue after 5 years, the cost of the loan, the repayment period of 5 years, the annual interest rate at 10 %, value added tax 16 %, kWh price of 0.01 USD and operating charge in 5 years. Our study produced the results providing the elements for the analysis of the financial viability of the distribution network deployment project, which is a major contribution in the field of the electricity network.

Author Keywords: Viability, financial, project, investisment, distribution, network.


Abstract: (french)


Le projet de déploiement d’un réseau de distribution est principalement lié aux résultats financiers, plus tôt qu’à son aspect technique. Dans le cadre de notre sujet de recherche, nous avons considéré la puissance installée, l’énergie annuelle demandée, la recette annuelle après 5 ans, le coût du prêt, la durée de remboursement de 5 ans, le taux d’intérêt annuel à 10 %, la taxe sur la valeur ajoutée 16 %, le prix kWh de 0,01 USD et la charge d’exploitation en 5 ans. Notre étude a produit les résultats donnant les éléments d’analyse de la viabilité financière du projet de déploiement du réseau de distribution, ce qui est une contribution d’une envergure capitale dans le domaine du réseau électrique.

Author Keywords: Viabilité, financier, projet, réseau de distribution.


How to Cite this Article


Yaba Moke Ngeme Liévin, “Study of the financial viability of the project to deploy the Medium Voltage/Low Voltage electrical distribution network in the MPASA 1 district, Nsele commune, city-province of Kinshasa in DR Congo,” International Journal of Innovation and Applied Studies, vol. 36, no. 1, pp. 231–234, April 2022.