[ ANALISIS DE PORCENTAJE DE DESPERDICIO DE ACERO EN DOS ESTRUCTURAS DE HORMIGON ARMADO ]
Volume 25, Issue 1, December 2018, Pages 1–7
Christian Almendariz Rodríguez1, Felipe Naranjo Calderón2, and Alcibar H. Yánez3
1 Universidad Católica Santiago de Guayaquil, Guayaquil, Ecuador
2 Universidad de Guayaquil, Facultad de Ciencias Matemáticas y Físicas, Universidad de Guayaquil, Guayaquil, Ecuador
3 Facultad de Ciencias Matemáticas y Físicas, Universidad de Guayaquil, Guayaquil, Guayas, Ecuador
Original language: Spanish
Copyright © 2018 ISSR Journals. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
This article applies a methodology for the optimization of the calculation of steel material in the construction of a reinforced concrete structure focused on two projects, a material calculation methodology is used in which we use a steel cutting blade to proceed to measure each bar trace indicated in the structural plans, to then account for the total steel weight of the structure and then measure and account for the total purchase weight.
Author Keywords: Waste of material, steel cutting blade, percentage of waste.
Volume 25, Issue 1, December 2018, Pages 1–7
Christian Almendariz Rodríguez1, Felipe Naranjo Calderón2, and Alcibar H. Yánez3
1 Universidad Católica Santiago de Guayaquil, Guayaquil, Ecuador
2 Universidad de Guayaquil, Facultad de Ciencias Matemáticas y Físicas, Universidad de Guayaquil, Guayaquil, Ecuador
3 Facultad de Ciencias Matemáticas y Físicas, Universidad de Guayaquil, Guayaquil, Guayas, Ecuador
Original language: Spanish
Copyright © 2018 ISSR Journals. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Abstract
This article applies a methodology for the optimization of the calculation of steel material in the construction of a reinforced concrete structure focused on two projects, a material calculation methodology is used in which we use a steel cutting blade to proceed to measure each bar trace indicated in the structural plans, to then account for the total steel weight of the structure and then measure and account for the total purchase weight.
Author Keywords: Waste of material, steel cutting blade, percentage of waste.
How to Cite this Article
Christian Almendariz Rodríguez, Felipe Naranjo Calderón, and Alcibar H. Yánez, “ANALYSIS OF PERCENTAGE OF STEEL WASTE IN TWO ARMED CONCRETE STRUCTURES,” International Journal of Innovation and Applied Studies, vol. 25, no. 1, pp. 1–7, December 2018.