With a population estimated at 17.07 million inhabitants in 2021 and an electrification rate of around 45.5% [1], the electricity supply deficit of the City-Province of Kinshasa is estimated at 54.5%. Reversing this trend is one of the concerns of the Government of the Republic. It is within this framework that several rehabilitation and extension programs are underway. These projects are financed by either international donors such as PMURR, PMEDE, PEPUR, EASE MALT, or SNEL SA itself with its own funds, or through direct intervention by the Congolese government. The implementation strategy of the EASE project by SNEL SA DKO will be the subject of this analysis. Considering the volume of data it is supposed to generate, computer management based on NoSQL data is the most appropriate to the point that it is likely to make it efficient.
The Geographic Information System today plays a fundamental role in the life of organizations given its direct impact on its strategic and operational areas is built thanks to the contribution of materials provided by three main parameters: digital, electricity and geography, prototype tested at the National Electricity Company of the Democratic Republic of Congo. The advantage of this model is that the data is stored in the server so that the users - customers of the electricity network have access to it with a positive impact not only on the technical and commercial management of sales centers but also on the control system of senior management in real time. The data thus collected in the field made it possible to constitute a database for the operators of the electricity network. The aggregation of the above-mentioned elements has made it possible to develop an effective and efficient geographic information system, therefore efficient, and this by hybridization between database management software, vector drawing and image processing, for decision-making at the level of the company’s organizational management system.